Cut scope, not corners

Two ways to make a date

Every project reaches a week where the release is at risk. There are two ways to still make the date. One is to cut corners: skip the tests, leave the error states for later, ship the code nobody reviewed. The other is to cut scope: ship fewer things, finished properly.

We always choose the second, and we say so in the first week, so nobody is surprised when it happens.

How we cut

  • We cut whole features, not parts of them. A feature without its empty state or its error message is not smaller, it is broken.
  • We cut from the end of the list, which we agreed with you at the start, so the decision is not made in a hurry.
  • What we cut is written down, with an estimate, and becomes the start of the next release.

A smaller product that works is a better release than a larger one that mostly works.

Keep reading.

  1. Process, , 4 minWhy our estimates come as a rangeMarta WysockaFounder, Managing Partner
  2. Engineering, , 5 minPlan the handover in week onePiotr ZalewskiEngineering Director
  3. Design Systems, , 4 minDesign tokens before componentsNaomi IshikawaDesign Director